To what extent and involvement did I have with preparing

  schedule of rates and costing estimates for various highway schemes and did I have any involvement liasing with Direct Labour Teams / Outside Contractors for said schemes.
Answer

Interview Answer

1 Answer

0

Yes, detailed preparations of all costings from Local Authority schedules and internal costings on all aspects of Highway Schemes that a local authority undertook from drainage, road construction, signing and ligning and labour costings - giving examples of small, medium and larger highway schemes and how these would differ with current CDM regulations.