↳
asked for the dimensions and plugged away
↳
290 million in the centre court with roof closed
↳
One
↳
I will talk about all customers' BP products. First, let's talk about the product and then discuss its quality and the benefits of using it. Less
↳
I am Searching job
↳
by hard work and alot of cometment beside the team work and using the responsible logical thinkig for solving problems Less
↳
Bs Electrical power engineer
↳
Bs electrical engineering
↳
B.E Petroleum Engineering
↳
Really good lessons to get into top tech companies: bit.ly/faang100
↳
Questions were honorable and reliable to you?
↳
Depends on the EPCC stages of the project and the categories the employment had been considered. To my opinion I myself could do the lead in earthwork to the end of construction or to start from civil affairs till the mechanical completions. Obviously it regards to the discipline the hiring takes place. Less
↳
Experienced, dependable person with Lng process Work and cost control. Strive to make decisions and be profitable. My background is proof of my dedication and work ethic. Less
↳
The kelly typically is about 10 ft (3 m) longer than the drill pipe segments, thus leaving a portion of newly drilled hole open below the bit after a new length of pipe has been added ("making a connection") and the drill string has been lowered until the kelly bushing engages again in the rotary table Less
↳
Be honest and concrete. Any engineering details help your case.