Glassdoor users rated their interview experience at K-pack Systems as 100% positive with a difficulty rating score of 3 out of 5 (where 5 is the highest level of difficulty). Candidates interviewing for Proposal & Marketing Engineer and rated their interviews as the hardest, whereas interviews for Proposal & Marketing Engineer and roles were rated as the easiest.
The hiring process at K-pack Systems takes an average of 60 days when considering 1 user submitted interviews across all job titles. Candidates applying for Proposal & Marketing Engineer had the quickest hiring process (on average 60 days), whereas Proposal & Marketing Engineer roles had the slowest hiring process (on average 60 days).
I applied through a recruiter. The process took 2 months. I interviewed at K-pack Systems (Bengaluru) in Sept 2017
Interview
Got a call from company in morning around 8;30 am on 17-09-2017 for the interview on the same day at 11;30 am.
Gave interview to 2 engineers who was working in proposal department,and got a task to identify potential consultants working in the same field.
After reaching home, sent them a list and got confirmation of 2nd interview on 28-09-2019.
Given my 2nd interview on 12-10-2017 with a panel of Director, Senior General Manager and 2 Proposal Engineers. They asked all the basic questions related to waste water treatment and discussed about salary part.
And than, I joined from Dec-2018 and currently working.
Interview questions [1]
Question 1
1-Basic Introduction.
2-Detailed explanations about Project in Bachelor studies.
3-Training details.
4-Waste water treatment levels ( preliminary, primary, advance primary, secondary... so on).
5-Wastewater treatment processes (physical, chemical, physio-chemical, etc)
6-Coagulation, flocculation etc.